Courier Branch Offices, Kiev, Ukrayna

postal office container buildings
Courier Branch Offices, Kiev, Ukrayna
 
Usage Purpose : Nova Posta Company, Courier Branches
Building Model: New Generation Container
Building Number: Assembled 3 Units 300x700 cm
Total Area: 189 m2 (63x3 m2)
Project Year: 2019
Completion Duration: 3 days

The Agency Offices of Nova Posta, which is Ukraine's leading brand in Cargo transport.

We set up postal office buildings for Nova Posta company, Ukraine's industry-leading brand in cargo transport and non-bank electronic cash transfer. New Generation Container of Karmod, which has become the sought-after brand for long-lasting office preferences with its numerous outstanding advantages, will host Cargo Dealers of Nova Posta in capital city Kiev with its Cargo Branch Offices, each of which has 63 square meters. Nova Posta is the industry-leading brand in the top 100 businesses of the country with its economic size providing employment for over 28 thousand people in its more than 5 thousand branches. The company continues its cargo logistics operations within Ukraine as well as overseas shipping transfers.

 

In the location of our office buildings, which are specially designed for the corporate use of cargo branches, there are two main entrances on the facade facing the street. The wide door with a double opening on the right side, was planned in a manner facilitating the transfers during the daily intensive usage circulation of cargo companies. Extending deeply to the rear, this storage area provides a door to the attendant area in its 40 square meters interior area. The entries of main staff and customers are allowed through the door on the left that is also in the front facade. In this section, there is an entrance to the main hall where the working desk of attendant is located. In the rear, there is managerial room with glass panels. Each of the Nova Post office buildings, which were pre-produced in Karmod production facilities in Turkey, was installed ready for use in 1 day with the help of a team of 2 persons and a crane. The total installation of the Karmod cargo branch buildings established in three separate districts in the capital Kiev took only 3 days.

 