Oil Pipeline Worksite Buildings, Franceville, Gabon

Oil Pipeline Worksite Buildings, Franceville, Gabon
Usage Purpose: | Technical Personnel to Work for Pipeline Laying |
---|---|
Building Model: | New Generation Container |
Building Number: | 230x595 cm 31 Units |
Total Area: | 424 m2 |
Project Year: | 2019 |
Completion Duration: | 27 days |
Karmod New Generation Container, now in Gabon Oil Pipeline Worksite
Karmod New Generation Container, which has advantages developed specifically for difficult site working conditions, was preferred in the worksite building group of the oil pipeline laying project in Gabon, one of the countries in the central part of Africa. Our worksite buildings built in Franceville City, State of Haut-Ogooue, in the southeastern part of the country, will be used by the technical personnel involved in laying the pipeline. Our New Generation Container products are known as the revitalizing buildings in the worksite worker camps along with their bolted-nut and dowel features and the ergonomics presented by sandwich panel wall and roof system providing high insulation in all weather conditions.
The businesses operating in the field of oil, energy, and mining especially prefer Karmod brand in their worksite buildings because of its quality preserving its appearance of the first day for many years. In our worksite project in Franceville, Gabon, 230x595 cm demounted units were preferred. Our products shipped to the country by sea were transferred to the installation site by road within the same sea container. The building group of 424 square meters where the total of 31 units was installed with the screw and dowel system was delivered ready for use in such a short time as 27 days. Within the scope of the project, 19 dormitory buildings where the single, double, and quadruple beds are available, were installed.
WC and shower units were installed within the single and double rooms of these dormitories. In the project with a capacity of 53 beds, a dining building which includes a large hall where 60 people can eat at the same time, a kitchen and a cold storage room was prepared. Two buildings with quinary toilet and quinary shower units, laundry room, and health cabins constitute the other buildings in the project.