You can reach us from our sales offices and call center for all your requests.

Container School Building – Potsdam, Germany

Porpuse Of Use Music Education Center
Building Model New Generation Container
Number Of Buildings 70 units (56 units of 3x7 meters and 14 units 3x9 meters)
Total Area 1.575 m²
Project Year 2019
Region To Be Used Potsdam, Germany
Completion Time 35 days
Currently 61 guests are viewing this project

Container Music Education Center in Germany

Karmod Container, which is produced in the quality of use for container office purposes with the New Generation concept, will be used as the Music Education Center Building in Germany. Successful musicians of the future will be trained in the building prepared with a total of 70 units in the city of Potsdam.

The structures prepared in Karmod production facilities with the fully disassembled system were delivered to the installation site in Germany by highway transportation. Container structures, which are easily installed in a short time by the screw and plug-in system by Karmod on site teams, can be used for many years.

Within the project, 56 pieces of 3x7 meters container units prepared with demounted pre-production and 14 pieces of 3x9 container units were brought together in Karmod modern facilities and the building was installed with a combined container structure system.

Sandwich panel walls with high sound in their standard production have also been applied with special sound insulation coating so that the extra sound that will occur during music education can be isolated. With this application on the walls of the container building, it was aimed to minimize the sound of music education.

We raised the standards in container dimensions

Karmod has brought innovations to container models with its new generation container fully demounted structure system. With this innovative container system, the usual unit structure of 2.30x5.95 meters, which cannot exceed 14 square meters, has been completely overcome. Within the project, larger rooms with a size of 1,575 square meters were prepared by using container sizes 3x7 (21 square meters) and 3x9 (27 square meters) units together. Karmod has introduced innovation to its industry with its fully demounted container system.

With the Karmod new generation demounted container model, modern container office buildings can be prepared. Container units prepared with fully screwed and plug-in system using the welding less construction technology can be shipped to any country in the world with the ease of the demounted structure model. Container structures assembled on site by Karmod assembly experts in accordance with the project conditions are delivered ready to use. With our container building model, many buildings such as school buildings, administrative offices and construction sites are built in a short time and are offered for long-lasting use. 

Our Projects

This is our job

From one end of the world to the other, we enable our customers to reach the ready-made construction sector produced with the new technology of the world. We guarantee reliability through technology and innovation, flexible commercial models and smart supply chain solutions that add value for you, following the project production network.

Discover

Our Major Projects