Benghazi Benina International Airport

Bingazi Drill for Oil Project – Benghazi, Lİbya

 

Intended Use:  Construction Site Mobilization
Building Model:  Prefabricated Building
Number of Building:  3
Total Lenght in Metres:  659 m2
Year of the Project:  2012
Completion Time:  28 days

 

Karmod that built construction site buildings for energy, mining, road and airport construction, mass housing projects, added one more to its construction site mobilization it designed for energy sector. We built construction site buildings for  drill for oil facility in Libya, one of the countries exporting oil.

 

We sent prefabricated building group consisting of 4 pieces to Libya by sea for this project in Benghazi. In the 659 square meters mobilization project, there are prefabricated office building, dining hall and dormitory buildings and a building that has wc shower and dressing room inside.

 

Construction site complex built for Al-Khairat Al-Andasiya company was delivered ready for use by being produced in a short time at Karmod production facilities and being installed on site. Prefabricated office building prepared as 197 square meters sized within the project has been designed in a way that there will be work rooms, meeting rooms and labs in it.

 

Prefabricated dormitory building was designed in a way that there will be a hallway at the center right and left. The dorms were designed taking into international occupational health standards and according to number of people who will stay.

Prefabricated dining hall was designed with a big eating hall kitchen that is independent from both hall and the entrance. Table d’hote presentation counter has been placed between in the kitchen and the hall. At the other building that has 68 square meters area, there are dressing rooms with wc and shower units.

 

Our new generation prefabricated buildings we produced with the renewed technology are one of the first choices of construction site projects that the time is very important.  The essential differences of our buildings produced in modern facilities with bolted joint and click-fit system without using welding are fast production, demounted system easy transportation advantage and installation on site by supervisor teams in a short time.

Also technical support before the production can be given to construction site projects with Karmod expertise. To make easier to choose of suitable mobilization for the project, we support our customers with our expertise and in consideration of the informations such as distribution of blue-collar worker, technical office, manager and how many people will take a part and which stages.

Karmod in Social Media

WhatsApp

Call Us

E-mail